One battery can’t run a whole house for long. It can run the parts you actually need for much longer, if you choose them on paper before anyone touches a breaker.

Short answer: A critical loads panel is a second breaker panel, fed by your battery system, that holds only the circuits you want during an outage. EnergySage puts the average US home at about 30 kWh a day, which would drain a 13.5 kWh battery in about 11 hours. Trim the backed-up circuits to the roughly 10.5 kWh a day in our example below, and the same battery lasts about 31 hours. You can plan it yourself in an afternoon. The wiring is permit-and-inspection work, and part of it happens inside your main panel.

EnergySage warns that the circuit choice comes early in a solar-plus-storage project, is not easy to undo, and takes an electrician to change later. So the planning is the part worth getting right.

Do you need one?

Not every battery setup uses a separate panel. Three common approaches:

ApproachHow it worksBest for
Critical loads panelChosen circuits move to a second panel; only those get backupSmaller batteries and long outages; simple and predictable
Whole-home backupThe whole house stays on; you ration by hand during an outageBigger battery banks; owners who will watch their usage
Smart panel or load controlSPAN replaces the main panel; ReliaHome retrofits and controls up to 12 circuitsOwners who want to change priorities without rewiring

EnergySage reports that SPAN extends average backup time by about 40% over a traditional critical loads panel.

A panel is about energy more than power. Tesla rates Powerwall 3 at 11.5 kW continuous, enough to carry a lot at once, with only 13.5 kWh to spend. Enphase’s IQ Battery 5P is more limited on both counts: 3.84 kVA continuous and 5.0 kWh per unit. A single 5,000 W dryer, the figure in the NYSEG and RG&E home energy guide, is more than one 5P can carry, and running it for an hour would use the whole unit’s energy.

Step 1: Map your existing panel

Turn breakers off one at a time, with a helper or a plug-in lamp, and write down what each one feeds. Old panel labels are often wrong. Look for what surprises people during an outage: boiler controls, the sump pump, and the refrigerator outlet that also feeds half the kitchen.

Step 2: Build a load budget

List what you’d want through a three-day outage, then add up power and energy. Here is a sample using the NYSEG and RG&E guide’s estimates, with its monthly figures divided by 30. They are averages from a utility guide, so measure your own where you can. A plug-in watt meter handles anything with a cord.

LoadWatts when runningEnergy per day
Refrigerator, frost-free478 W4.8 kWh
Furnace fan/blower438 W3.5 kWh
Well pump, ¾ hp575 W0.7 kWh
Modem20 W0.1 kWh
Laptop50 W0.2 kWh
Microwave1,463 W0.3 kWh
Drip coffee maker1,225 W0.4 kWh
Ten 10 W LED bulbs, 5 hours (our assumption)100 W0.5 kWh
Total if everything ran at once4,349 W10.5 kWh a day

Divide battery capacity by daily energy. One Powerwall 3 runs this list for about 31 hours. Two Enphase 5P units, at 10 kWh, run it for about 23 hours. Winter solar recharge can be thin, as we cover in generator or battery backup.

Then check the peak. All of those loads at once come to about 4.3 kW, more than one 5P’s rating, so you’d want two units or a habit of not running the microwave and coffee maker together. Motors need their own check. The Franklin Electric starting figure in our well pump sizing guide for a ¾ hp 2-wire pump is 40.7 amps. That is above one 5P’s 32-amp, 3-second peak but well within Powerwall 3’s 185 LRA rating.

Step 3: Decide what stays off

In the NYSEG and RG&E guide, an electric water heater is listed at 4,500 W, a range with oven at 12,133 W, a dryer at 5,000 W and a 36,000 Btu central air unit at 3,600 W. Those are the circuits that empty a battery. Electric heat is its own design problem. Add a medical device or sump pump before any convenience load.

Step 4: Hunt for shared neutrals

This is the classic trap. A multiwire branch circuit uses one neutral for two hot wires, usually on a two-pole or handle-tied breaker, often in older kitchens. On the Mike Holt code forum, electricians are clear about moving one to a protected loads panel: both legs and the neutral have to move together. Move only one leg and loads on the other can end up connected to the battery side during an outage. Find these in advance, because they use up two spaces in the new panel. If you can’t tell what you’re looking at, call an electrician.

Step 5: Draw it before you buy it

The power path runs from your main panel to the battery gateway or transfer device, then on to the critical loads panel. Size the feeder and its breaker from your load calculation and the equipment manual. Leave open spaces for later. Tesla’s Powerwall documentation lists partial-home and whole-home wiring diagrams, so work from the current manual for your exact model.

One rule catches many first-time panel installs. In a subpanel in the same building as the service, the neutral bus must be isolated from the enclosure, as the IAEI explains under the NEC’s grounding rules. That usually means leaving out the bonding screw or strap that came in the box, with neutrals and grounds on separate bars.

Step 6: Permit, wiring and inspection

Rules vary by town, so call your building department before you start and ask who may do the work. As one local example, New Paltz’s solar and battery application asks for electrician license numbers, ratings for the battery, transfer switch and inverters, plans stamped by a New York design professional, and both rough and final inspections by a town-approved electrical inspector.

When the circuits are moved, the utility side of the main panel stays live even with the main breaker off. Our standard advice for that work is an electrician, and only your local rules can say whether doing it yourself is allowed. Use breakers listed for the new panel, and don’t stretch a short wire without a proper listed splice in an approved enclosure.

Step 7: Test it like a real outage

After inspection, open the main breaker or use the system’s outage test, per its manual. Walk the house. Every circuit on your list should be on, and everything else off. Start the well pump, the furnace and the fridge together, then watch the battery app for a few hours to compare real use with your budget. Tape the load list inside the panel door.

Plan on paper firstOur free design app turns your usage into a system size. The $149 package adds a build-ready plan, and our $39 install guides cover the Powerwall 3, EG4 12kPV and MidNite Rosie step by step. Check each one against your local code and the maker’s manual.

Quick answers

What is a critical loads panel?

It is a second electrical panel, fed by your battery system, that holds only the circuits you want during an outage, such as the refrigerator, furnace blower, well pump, some lights and the internet.

What should go on a critical loads panel?

Start with the refrigerator, freezer, furnace or boiler controls and blower, well pump, sump pump, medical equipment, some lights and the modem. Leave off dryers, electric ranges, electric water heaters and electric heat.

How long will one battery run a critical loads panel?

Divide the battery’s kWh by your daily use on those circuits. Our worked example uses about 10.5 kWh a day, so a 13.5 kWh Powerwall 3 lasts about 31 hours before any solar recharge.

Can I install a critical loads panel myself?

Planning, labeling and measuring are good DIY jobs. The wiring is work inside the service panel, needs a permit and inspection, and local rules decide who may do it. Check with your building department first.

Do I need a critical loads panel with a Powerwall 3?

Not for power: at 11.5 kW continuous, one unit can carry much of a house. The panel is about energy. It stops a 13.5 kWh battery from being drained by big loads overnight. Smart panels are another way to do that.